Service Hotline: +86-13612997580 (wechat/whatsapp)
Email: sales@365pcb.com
Reliable High TG PCB manufacturing for demanding high-temperature applications. Fast delivery, quality assurance, and multi-layer options available.
Our High TG PCBs are engineered for high temperature environments, providing superior thermal stability and mechanical reliability. Using specialized FR4 materials with elevated glass transition temperatures, these PCBs resist deformation and performance degradation under heat, making them ideal for applications requiring robust thermal endurance.
We manufacture High TG PCBs suitable for both prototyping and volume production, with precise etching, excellent dielectric properties, and multiple surface finish options.
• Automotive electronics and engine controls
• Power electronics and converters
• LED lighting systems
• Industrial automation equipment
• Aerospace and defense electronics
• TG rating typically ≥ 170°C (varies by product)
• Board thickness from 0.4mm to 3.2mm
• 1 to 12 layers supported
• Surface finishes: lead-free HASL, ENIG, OSP, immersion silver
• Minimum trace/space down to 4/4 mil
• IPC Class 2/3 and RoHS compliant
• ISO 9001 certified production
• 100% electrical testing and AOI inspection
• Prototype lead time: 3-5 business days
• Mass production lead time: 7-12 business days
• MOQ: 5 pcs or more
“The High TG PCBs from China 365PCB withstand our demanding thermal cycles perfectly.” – Michael T., VoltWorks
Q1: What is High TG in PCB?
A: High TG refers to the high glass transition temperature of the PCB substrate, meaning it can withstand higher heat without deforming.
Q2: Why choose High TG PCBs?
A: They are essential for applications exposed to high soldering or operating temperatures to ensure durability.
Q3: What layer counts are available for High TG PCBs?
A: From single-layer to 12-layer PCB manufacturing is supported.
Q4: Are these PCBs RoHS compliant?
A: Yes, all High TG PCBs meet RoHS environmental standards.
Q5: What is the typical delivery time?
A: Prototypes within 3-5 days; volume production in 7-12 days.